| Installation |
|
|
|
| Existing
driveway prior to work commencing. |
Driveway
excavated and back filled with stone to required depth. |
 |
 |
| All
necessary drainage installed to requirements. |
Recessed
inspection cover fitted where required. |
 |
 |
| Shuttering
installed to retain the concrete to desired shape. |
Concrete
is placed and levelled. |
 |
 |
| Concrete
is finished to road level. |
Placed
concrete is roller-bugged to flatted and push down aggregate. |
 |
 |
| Concrete
is coloured and trowelled. |
After
concrete is levelled and coloured the stamping process can begin. |
 |
 |
| Detailing
of the borders. |
Manually
installed crack control joints to prevent random cracking. |
 |
 |
| The
driveway is left for 1 – 3 days to harden then thoroughly
cleaned with a pressure washer. |
After
the concrete is totally dry acrylic sealer is applied to the surface
to bring out colour and prevent stains. |
 |
 |
| Recessed
inspection cover to replace unsightly cast iron item. |
Finished
driveway to last for years to come. |
 |
 |
| |